Installation Complete: Cross Lake Roll-Off Load Out Facility in Backus, Minnesota
72' x 126' Apex Series from Britespan Building Systems
The GC Fabric Building Division recently completed a load out facility in Backus, Minnesota. Cross Lake Roll off was built to satisfy Minnesota Pollution Control (MPCA) construction demolish material sort requirements for a material before it reaches the landfills.
The building features an excavator bay and recessed drive lane through the building for load out. Three sidewall openings and and an extended 14' clearance height will allow semi trucks to pass through, which will assist in operations.
Features
-
72' x 126' Apex Series Building from Britespan
-
Extended 14' Leg Height
-
4' Poured Wall Foundations
Building Specs
-
Location: Backus, Minnesota
-
Size: 72' x 126'
-
Year: 2024
-
Use: Waste Load Out Facility